Lots happening with cladding, electrical pre-wiring, stonemason has done the two pillars to deck height, and started on the chimney.  Ceiling in lounge framed down about a metre around the edges to 2.4m stud height with central area up at 2.7m, and the Dining / Casual Living space ceiling battened at 3.4 metres then sloping down to 2.4m at the fireplace end...  Dad & Roy spent saturday filling up the back and front decks.  Galvanised channel around the back door along kitchen wall so we can tile after concreting.  Same on the front deck.