Lots happening with cladding, electrical pre-wiring, stonemason has done the two pillars to deck height, and started on the chimney. Ceiling in lounge framed down about a metre around the edges to 2.4m stud height with central area up at 2.7m, and the Dining / Casual Living space ceiling battened at 3.4 metres then sloping down to 2.4m at the fireplace end... Dad & Roy spent saturday filling up the back and front decks. Galvanised channel around the back door along kitchen wall so we can tile after concreting. Same on the front deck.
Wow - love, love, love the stone - it's gorgeous! Rather exciting getting windows - its becoming real!
ReplyDelete